Today the Manual for the interconnection of Power Plants and the Connection of Load Centers (the “Manual”) issued by the Ministry of Energy (“SENER”), was published in the Official Federal Gazette. It provides the requirements, describes the process and procedures, and defines the obligations and rights to be observed regarding the requests for interconnection of power plants or the connection of consumer load centers to the National Transmission Grid and General Distribution Grids that are filed with the National Center of Energy Control (the “CENACE”).
To read more, please download PDF.